Bathroom Renovations Calgary | Full Renos & Showers
Home Process About SERVICES: Stucco Parging Stone & Masonry Tile Commercial Blog Contact Get Quote
Full Renovations · Showers · Tub Surrounds

BATHROOM RENOVATIONS CALGARY

Full bathroom renovations across Calgary: we strip the room out and build it new. Plumbing, electrical, waterproofing, tile, tub or shower, vanity, countertop, mirrors and lighting, one crew under one written quote, with a 3D rendering of the finished room before we start. 5-year written warranty.

Full Renovations· Walk-In Showers· Heated Floors· Tub Surrounds
See Our Work ↓

Get A Free Quote

Please provide a phone number or email so we can reach you.

Prefer to call or text photos? (403) 700-8415

Licensed and insured Schluter-certified installers WCB registered 5-year written warranty
Everything, One Crew

A Full Bathroom Renovation, Handled End To End

Whether you call it a bathroom remodel or a full bathroom renovation, this is the whole room: out to the studs and back to finished, with every trade on it ours to manage. You choose the finishes. We handle the rest.

Design & 3D Rendering

We measure the room, talk through layout and finishes, and render the finished bathroom in 3D before anything is torn out. Included on every full renovation.

Demolition & Strip-Out

Old tile, tub, vanity, flooring and drywall out, subfloor and framing checked and corrected, everything hauled away. The house stays clean and sealed off while we work.

Plumbing

New shower valves, relocated drains, tub and shower rough-in, vanity supply and drain. Licensed plumbing with permits pulled, included in the quote.

Electrical & Lighting

Vanity lighting, pot lights, exhaust fan, heated floor circuit and GFCI outlets. Licensed electrical with permits, included in the quote.

Waterproofing & Tile

Schluter Kerdi on every wet wall and floor, then porcelain, marble-look or natural stone set by certified installers. Heated floors on Ditra-Heat.

Tubs, Showers & Glass

Freestanding or alcove tubs, curbed or curbless showers, benches and niches, frameless glass measured after the tile is done.

Vanities, Countertops & Mirrors

Vanity, quartz or stone countertop, undermount sink, faucet, mirror or medicine cabinet. Supplied by us or installed from your own selections.

Finishing

Paint, trim, towel bars, accessories, toilet, and a final clean. You walk in to a finished bathroom, not a punch list.

Recent Work

Real Calgary Bathrooms, Real Tile

Our own jobs in Calgary homes.

3D rendering of a bathroom renovation design: walk-in shower, marble-look porcelain walls and a floating oak vanity
RENDERED BATHROOM

3D rendering of your own bathroom, included in every full renovation quote

See it before we build it

Your bathroom, rendered before we start

No guessing what "modern" will look like in your house. Every full renovation includes a 3D rendering of your actual bathroom in your chosen finishes, approved by you before demolition day.

01

Walk us through your vision

Layout, finishes, fixtures, the inspiration photos on your phone. We measure the space and listen.

02

We render it in 3D, included

A rendering of your bathroom in your chosen tile and fixtures, not a stock photo. Included in the price of every full renovation.

03

We build exactly that

The rendering you approved is what gets built, at the fixed price you approved. No surprises on either count.

How A Renovation Runs

From First Visit To Finished Bathroom

  1. 01

    Visit and measure

    We look at the room, the plumbing and what is behind the walls, and listen to what you want. Free, and usually the same day you call.

  2. 02

    3D rendering and written quote

    You see the finished bathroom in your chosen tile, vanity and fixtures. The quote is written, complete, and fixed before we start.

  3. 03

    Strip-out

    Everything old comes out. Framing and subfloor are corrected so the new room is square, level and dry.

  4. 04

    Plumbing and electrical rough-in

    New valves, drains, wiring, fan and the heated-floor circuit go in and are inspected before a single wall closes up.

  5. 05

    Waterproofing and tile

    Kerdi-Board and membrane on every wet surface, then the tile, set flat and grouted.

  6. 06

    Fixtures, vanity, glass, finish

    Tub or shower fixtures, vanity and countertop, mirror, lighting, glass, paint and trim. Final walkthrough with you, warranty in writing.

Not The Whole Room?

Showers, Tub Surrounds And Mastiff

Some bathrooms only need the wet area done. Same crew, same waterproofing, same warranty.

Tub Surrounds

The tub stays, the walls come off, Kerdi-Board goes on and real tile goes over it. Three to five days. No plastic liner glued over the old wall.

Tub-To-Shower Conversions & Walk-In Showers

Walk in shower installation for anyone done with stepping over a tub: tub out, a curbed or curbless shower in, with a bench, a niche and glass.

Mastiff Seamless Finish

A trowelled, stone-textured finish applied instead of tile on shower walls, tub surrounds, feature walls and countertops. One continuous surface, no grout lines. See Mastiff ↓

Instead Of Tile

Mastiff: A Stone-Textured Finish Instead Of Tile

Mastiff is a trowelled finish we apply in place of tile: one continuous surface with the texture of rough-cut stone, no grout lines and no joints to scrub. It goes on shower walls, tub surrounds, feature walls and even countertops, and it is one of the finishes Calgary homeowners are asking for most right now.

In a wet area it goes over the same Kerdi waterproofing we put under tile, so the look changes but the system underneath does not. The shower shown here is a recent Calgary job. It is quoted the same way as tile, after a free visit.

Calgary shower finished in Mastiff seamless finish instead of tile, matte black rain shower and a recessed niche
Mastiff finish, Calgary shower: one continuous surface, no grout lines.
Waterproofing done right

Beautiful is the easy part

What decides how long your bathroom lasts is what goes underneath the tile. This is the Schluter system we install in every wet area, exactly as the manufacturer specifies, step by step.

01

The base, done right

A straight, solid alcove and a factory-sloped Schluter base with the drain kit. The slope to the drain is engineered, not eyeballed on site.

02

Kerdi-Board goes in

Waterproof board replaces drywall on the walls. It cannot rot, swell, or feed mould.

03

Wrapped in Kerdi

Membrane over every surface, seams banded, corners sealed to Schluter spec.

04

Then, the tile

Large format, set in full coverage so every tile is supported edge to edge.

05

Grouted. Finished.

Sealed grout, clean silicone corners, watertight for decades.

A failed shower pan is the renovation horror story every homeowner has heard. It is also completely avoidable. A tub surround gets the same system and the same warranty as a full renovation.

BATHROOM RENOVATION FAQ

What Calgary homeowners ask first.

We handle it. Plumbing and electrical are part of our renovation, done by licensed trades with permits pulled, scheduled by us and included in the written quote. You deal with one company from strip-out to the final walkthrough.

Either. We can supply everything through our suppliers and show it to you in the 3D rendering before you commit, or install what you have already chosen. Many clients pick their own tile and vanity and we are happy to install them. We flag anything about a choice that affects waterproofing, layout or cost before work starts.

A full renovation usually takes two to four weeks depending on scope, and where the home has a second bathroom we keep it working for you throughout. A shower rebuild or tub-to-shower conversion takes about a week. A tub surround takes three to five days.

Tile and finishing work needs no permit. Plumbing and electrical changes do, and we pull them as part of the job, so you never deal with the city yourself.

Yes. A tub surround or shower gets the same Schluter waterproofing and the same 5-year written warranty as a full renovation, and it takes three to five days.

A liner is a plastic shell glued over your old tub and walls, installed in a day. A tiled surround replaces the wet wall with Kerdi-Board, waterproofing and real tile. Tile takes a few days longer, can be repaired one piece at a time, and if water ever gets behind it the membrane carries it to the drain instead of trapping it against the old wall.

Winter is our indoor season, so booking is easier and timelines are shorter, while many renovation companies add winter premiums we do not charge.

Every renovation carries our 5-year written workmanship warranty. Showers and surrounds built on Schluter Kerdi by our certified installers also carry Schluter's 10-year system warranty. Both are in writing with the quote.

📞 Call